top of page
headimage.jpg

Esenyurt Ibis Hotel
Istanbul / Turkey, 2013

The building faces its entrance towards the E5 highway and consists of 3 basement floors, a ground floor and 6 typical room floors. While the 2 bottom basement floors are used as a car park, meeting rooms and services are placed on the first basement floor. On the ground floor there is hotel lobby, restaurant, bar, kitchen and offices. Hotel rooms are on the typical floor.

A vertical façade movement is aimed to draw attention during horizontal movement on the E5 highway. Different colors are used in the window casings to create an active and enjoying effect that is appropriate for the identity of IBIS as a brand.

Project facts

 

Architectural design: R.Güneş Gökçek

Architectural office: YPM

Project team: Hatice Baştabak, Bora Yıldırım, Birkan Sevinç, Artem Kolomeichuk, Emre Şahin, Mustafa Taşdemir

Project date: 2010

Construction completion date: 2013

Land area: 1.755 m2

Construction area: 7.313 m2

Structural project: Dr. Gökhan Tunç, Dr. Ali Ruzi Özuygur

Electrical project: Dilek Akmeşe

Mechanical project: Gökhan Bulut

Landscape architect: Erkan Erdoğan

Acoustic consultant: Duyal Karagözoğlu

Fire consultant: Prof.Dr. Abdurrahman Kılıç, Dr. Kazım Beceren

Interior design: Sanset-İkoor

Project Gallery

bottom of page