Esenyurt Ibis Hotel
Istanbul / Turkey, 2013
The building faces its entrance towards the E5 highway and consists of 3 basement floors, a ground floor and 6 typical room floors. While the 2 bottom basement floors are used as a car park, meeting rooms and services are placed on the first basement floor. On the ground floor there is hotel lobby, restaurant, bar, kitchen and offices. Hotel rooms are on the typical floor.
A vertical façade movement is aimed to draw attention during horizontal movement on the E5 highway. Different colors are used in the window casings to create an active and enjoying effect that is appropriate for the identity of IBIS as a brand.
Project facts
Architectural design: R.Güneş Gökçek
Architectural office: YPM
Project team: Hatice Baştabak, Bora Yıldırım, Birkan Sevinç, Artem Kolomeichuk, Emre Şahin, Mustafa Taşdemir
Project date: 2010
Construction completion date: 2013
Land area: 1.755 m2
Construction area: 7.313 m2
Structural project: Dr. Gökhan Tunç, Dr. Ali Ruzi Özuygur
Electrical project: Dilek Akmeşe
Mechanical project: Gökhan Bulut
Landscape architect: Erkan Erdoğan
Acoustic consultant: Duyal Karagözoğlu
Fire consultant: Prof.Dr. Abdurrahman Kılıç, Dr. Kazım Beceren
Interior design: Sanset-İkoor